Ballyshannon, Co. Kildare
 Tel: 045 485444 | Fax: 045 485406 
 Graham : +353 87 256 4962  
 Ben : +353 86 855 5995 
 Email: info@tankstoragesystems.com

High rate AD plant at Orchard House Foods in Corby.

This project was designed by Biowaste to process 146,000 tonnes per annum of fruit waste. The anaerobic digestion facility is located next to the fruit juice supplier's plant and generates biogas capable of providing up to a third of the company's electricity requirements.

Tank Storage Systems supplied the complete digestate storage system including: 

 - Digestate tank with 464m3 capacity

 - GRP tank cover

 - Electrical submersible mixer

header shadow   albers   bauer logo side   fan   permastore-logo